Below is a brief introduction and knowledge sharing of our company on Paver accessories series.
1. Starting steps of paver?
Answer: There are two kinds of paver starting: the first paving of an asphalt layer and the docking of the already paved layer. The former shall drive the paver to the paving place, and place the front edge of the ironing plate at about 10 cm behind the paving line, and support the ironing plate with at least two boards of the same thickness as the thickness of the layer; the latter shall place the ironing plate on the already paved layer and parallel the front edge of the ironing plate with the interface, and the underlying thickness shall be equal to the difference between the thickness of the loose paving and the compacted thickness of the paved layer.
2. What is the paver's paving speed?
Answer: When paving asphalt pavement, the paving speed should be between 2-5 m/min. Too slow, inefficient operation, severe wear and tear of machine parts; too fast, not only increases the difficulty of feeding, but also can not guarantee the initial compaction of pavement.
The company's SANY DTU95C Rubber for Paver quality stability, adequate supply assurance by major users and construction units nationwide unanimously recognized. Welcome to call us!
Commodity number | 201665921175435 |
Commodity brand | 三一 |
Inventory quantity | 1000 |
weight | 0g |
Unit of measurement | piece |
Quality guarantee period | Genuine guarantee |