Balancing beam type: 1. Tube balancing beam: welded with seamless steel pipe, lifting lug, reinforcing plate, etc., can be used to hoist pipes, steel structural parts and small and medium-sized equipment; 2. Steel plate balancing beam: for on-site processing, the thickness of steel plate is determined by the weight of equipment; 3. Steel channel balancing beam: composed of channel steel, ring plate, lifting lug, reinforcing plate, bolts, etc. Its characteristic is that the lifting point of the partition board can move forward and backward, and the lifting point can be selected according to the weight and size of the equipment. It is convenient, safe and reliable to use. 4. Truss balancing beam: welded by various profiles, rings, lugs, truss rotating axles, beams, etc. When the distance of hanging point is large, the truss balance beam is usually used to increase its stiffness.
Below is a brief introduction and knowledge sharing of our company on SANY DTU75 Balance Beam for Paver series problems:
17. What kinds of balance beams are there in paver?
Answer: There are several kinds of balance beams of paver: imported: MOBA, MINI-line domestic brands are also more, more on the market: Xi'an Guangwei, Baoying Siming, Changzhou Unicom and so on. Domestic and imported prices vary greatly, roughly as follows: domestic imports of 5-100,000: 120,000-180,000. Prices vary according to the number of probes.
18. Classification of Balanced Beams?
Answer: The balance beam of paver has mechanical and non-contact balance beam at present. The first 8 meters and the last 8 meters of mechanical balance beam have the best total length of 19 meters. This is related to the length of induction beam. The non-contact balance beam has strong specialty, strong technology and good stability. The probe is mainly imported. The working face has the same principle as our usual measuring point. Each working face is the measuring point.
19. Main Points of Paver Knowledge?
Answer: The working efficiency of asphalt paver is measured according to its productivity, so how to calculate the productivity of paver? Let's study it together. The productivity of asphalt concrete paver is calculated according to the weight (tonnage) of paving material required per hour. The formula is as follows: Q = 60H.B.V.P. (t/h) Q: productivity (t/h) H: paving thickness (m) B: paving width. Degree (m) V: Paving speed (m/min) P: Mixture density, generally take 1.8t/m3 RP601L, RP700L paver's maximum production capacity of 400 t/h, paving width, speed, thickness should be selected within the rated productivity range.
The company's SANY DTU75 Balance Beam for Paver quality stability, adequate supply assurance by major users and construction units throughout the country unanimously recognized. Welcome to call us!
Commodity number | 201666910219412 |
Commodity brand | 三一 |
Inventory quantity | 100 |
weight | 0g |
Unit of measurement | piece |
Quality guarantee period | Genuine guarantee |