全部| 技术文章| 新品上市| 最新资讯| 行业聚焦| 案例故事| 图片|
;
工程机械之家>整机企业>Construction of Atlas Copco rig on the 5
Construction of Atlas Copco rig on the 5
来自:工程机械之家 时间:2015-10-12 浏览数:0

Construction of Atlas Copco rig on the 5000 meter Plateau      

 

Who is to say that the plateau of the guard, that would be the Atlas Copco DM75E rotary drilling rig. May 2014 Liaoning Chengyuan Blasting Engineering Co. company introduced two Atlas Copco DM75E electric drill.

Nowadays, more than 120 kinds of mineral resources have been found in the Qinghai Tibet Plateau, and the potential value of the resources is very huge. So mining here is a common sight. Atlas Copco to the mining rig of Jiama mining area climate condition is very bad, the two rig company introduced the comprehensive perforation efficiency and net perforation efficiency reached 15m/h and 18m/h motors, the average hourly power consumption is only 300 degrees, according to 1.2 yuan per kilowatt hour calculation, use cost than diesel driven rig 40%. The mine work every day two classes, each DM75E drill eachclass needed 2 workers.

So, this product faces such high altitude conditions, such a harsh environment, in the end what are the secret to fight it?

1. adopt the motor and high voltage appliance control cabinet which is more suitable for the plateau environment.

2. the redesigned main frame has the characteristics of high strength and fatigue resistance.

3. using heavy duty crawler and chassis, more suitable for rugged work site.



上一篇: 下一篇:

我要评论:

加载全部评论