Drawing drawings of hydraulic system and compiling technical documents
The drawing of hydraulic system working diagram is a part of the summary in the hydraulic system. In the process of drawing, it is necessary to pay attention to and add the auxiliary chart and accessories too much, so be careful and earnest.
Drawing the schematic diagram of hydraulic system
In addition to drawing the loop of the whole system, the specifications, models and pressure adjustment values of each component should be clearly marked. At the same time, the working cycle diagram of each executive element is made. Finally, the action sequence table of the electromagnet and the pressure relay is listed.
If the oil circuit board is used, the components should be painted on the oil circuit board to facilitate assembly; if the set is used, the assembly will be easy to assemble
When the block or stack valve is used, the designer only needs to choose the general parts. Finally, the selected products are combined to make the assembly drawing.
The assembly diagram of the pump station is composed of an integrated oil circuit device, a pump, an electric motor and an oil tank. The assembly diagrams are made to show the mutual position, installation size and overall shape of the assembly.
Draw the assembly drawings and parts drawings of non-standard special parts.
The assembly drawing of the pipeline shows the direction of the tubing, the diameter and length of the pipe, the specifications of various pipe joints, the installation position of the clamp and the assembly technical requirements, etc..
The electric circuit diagram shows the control circuit of the motor, the control line of the solenoid valve, the pressure relay and the stroke switch, etc..
Writing technical documents
Technical documents generally include hydraulic system design calculation manual, hydraulic system use and maintenance technical specifications, parts catalog table, standard parts general parts and purchased parts summary table, etc..
Wonderful recommendation:
Qingdao heavy industry city muck car "sword" in Zhejiang Dongyang
Shaanxi governor Shaanqi ushered in the investigation
Shandong No.1 big diameter subway shield machine development line No.1