How to install excavator loading well and quickly
For excavator owners, time is money, so whether it is loading, transit or construction, as much as possible to save time. Today we have to share excavator loading technique.
Loading plan 1
(loading Figure 1) excavator is placed in a relatively good position.
The distance between the soil sampling point and the earth moving vehicle is small, and the angle of the excavator rotation is small, and the height of the platform for the excavator is also suitable.
Loading plan 2
There is another situation (loading chart 2), there are two vehicles to move the location of the car, but each time only allowed to near one car, another car No. 2 waiting outside the X-ray, then take the a soil mounted 1 car.
When the fast is full, the No. 2 car near, then take the B dirt car number 2. So cycle. You can save the time for reversing, this is probably the best loading mode!
Loading plan 3
But sometimes due to the site restrictions, excavators and earthmoving vehicles can only be located in position (loading chart 3).
Each must dig excavator to 180 degrees so that the speed will be relatively slow. Note that while this excavation should be taken into consideration in the excavator's retreat.
Loading plan 4
It is better to dig out the pit like A, then dig the soil at B into the A pit and dig it together (loading chart 4)
As to the order of each shovel in the earth moving truck, it is said that the front part of the truck is first loaded, and some people say that the first part is loaded and the part is good.
Xiaobian first installed before and after the first loading are the same, the habit of personal problems. There are only two situations to pay attention to, the first is the excavator work platform is too high, but also in (loading Figure 2) situation, if you install the first, and then install the front. Because excavators are digging back slowly, so it is possible to install the part after the former part will be too far away and can not be installed, so this situation is best to install the first part of the better.
Loading plan 5
Another situation is (truck map 5) excavators at the same height or even lower soil vehicles, then if the first part of the installation, it will block the driver's line of sight, can not see the front part of the soil transport box. So, let's start with the front part!
In fact, we often work, can make a summary of these loading techniques, now small and we share this article, is to share with you, and common progress.