1. Connect pneumatic tools to air production line
2. Set up air pressure
3, air production line must be set up air lubrication oil, if not or not meet the requirements, should give the tool to try the following routine maintenance:
1) after 3-4 hours of continuous work, separate the tool from the gas source, drop 7-8 drops of high purity light oil from the tool intake port, connect the gas pipe, open the gas source, and blow the oil into the cylinder. The conditional users and the working intensity are relatively full load, it is recommended to install a small lubricator at the intake joint.
2) usually 30-40 days need to air compressor and oil-water separator regular drainage, impurity removal maintenance, in order to ensure the cleanliness of the air into the tool and dry.
Familiar with the above installation steps, but also pay attention to equipment maintenance, which is conducive to the extension of the service life of the equipment. About more hydraulic pump knowledge and hydraulic pump accessories, welcome to sign the construction machinery house, or telephone consulting manager Sun: 13645201509.