Technical requirements for material conveying floor of construction machinery house
The supply floor of construction machinery house is strict in quality. The following is the technical information of our company according to the technical requirements of our company and the information of products.
Technical requirements and parameter indexes
1, the supplier's products should be the demand side of the supply status.
2, provide the product parts should be in accordance with the requirement of the drawing; the inner surface and the outer surface should be clean and free of dirt, there shall be no bump, scratches, deformation and corrosion defects. The supplier shall not alter the product drawings of the buyer without permission. If necessary, the supplier shall have the consent of the buyer.
3. The parts supplied by the supplier should be guaranteed by pressing and pressing, and the heating temperature should be controlled within the proper range before pressing.
Two, matching requirements
The parts supplied by the supplier should be transported by station tools, the transfer equipment should avoid direct contact with the paint film, all the contact surfaces should be softened as much as possible, and the cleanliness of the transfer tooling should be ensured, and the paint residue or dust on the transfer rack should be eliminated. And take effective safety measures to prevent, in the process of transportation have fall, bump, scratches, deformation and other phenomena; fittings should be added to the requirement of the general content of parts (specifications, material code, manufacturing code, bar code) and other relevant information, the inspection certificate and inspection records with the product delivery and acceptance.
Three, quality requirements
The supplier is responsible for the product quality, quality requirements are as follows:
1. The parts supplied by the supplier must meet the requirements of the buyer's drawings;
2, provide the parts may not appear bump, scratches, deformity, folds, resilient deformation, corrosion and pollution and other defects;
3. The products supplied by the supplier can be imported into the factory after the inspection of the supplier, and the supplier has the inspection certificate and inspection record of the supplier, and the goods are checked with the goods.
Four, supply acceptance
1. The supplier should provide the quality assurance certificate and the product inspection record for the raw material supply.
2, the inspection department acceptance requirements according to the agreement of the acceptance content (technical requirements) and drawings for acceptance. If the product provided by the supplier does not meet the content and quality requirements, the buyer can directly reject it.