全部| 技术文章| 新品上市| 最新资讯| 行业聚焦| 案例故事| 图片|
;
工程机械之家>整机企业>The new line and the successful delivery
The new line and the successful delivery
来自:工程机械之家 时间:2015-12-28 浏览数:0

The new line and the successful delivery of ZWZ   

 

Recently, ZWZ new bricklayer, and successfully sent to the customer. This is a group of mud pump bearings ZWZ group of independent research and development, and supporting a petroleum machinery company products.

The machinery company in July this year, the order 2 specifications of mud pump to ZWZ ZWZ bearing demand, engineering and Technology Research Center for technical personnel to install on-site customer site field survey. The researchers found that the engineering installation conditions of mud pump bearing is different from the past, the bearing load is more demanding, and the current existing ZWZ bearing of mud pump can not meet the installation requirements of customers. After careful study of the working conditions and technical exchanges with customers, the product development engineer of engineering technology research center put forward a new design plan by improving the design parameters, and achieved success in one fell swoop. Through customer acceptance, fully meet the supply requirements.

In the whole product design, R & D and manufacturing process, the technical research center of the engineering team and the staff of the manufacturing unit cooperate with each other to overcome the multiple difficulties and ensure the final smooth production of the product.

Related recommendation:

Thinking Cummins Engine

Focus on steel prices: tasteless gesture

Shield heavy industry, a scientific and technological achievements were identified at ministerial level

 


上一篇: 下一篇:

我要评论:

加载全部评论