Installation method of dividing rod and
来自:工程机械之家 时间:2014-03-22 浏览数:0

Installation method of dividing rod and long segment of RP952 asphalt paver   

 

Corresponding with the different paving width of paver, the configuration of the material distributing rod with different length and long and trough the front baffle plate, the front baffle plate and rod support be installed on the supporting rod, the ear plate supporting the other end of the pull rod is connected to the track beam support and the rear fuselage, for fix the front baffle plate, so as to ensure the overall rigidity of feed rod.


The host randomly divided rod with 250mm or 500mm for 3 extended to 4.5 meters before paving, and a baffle plate plate connected to the host, the most narrow configuration.


Outside of the paving material when the rod can be installed 250mm or 500mm to the outside of the lengthened segment, splitting blades from the screed end of the baffle plate is about 250mm to 500mm to the outside of the lengthened segment, splitting blades from the screed end baffle plate a gap of about 250mm or 500mm, the distance with the material grading, paving width, paving thickness, speed of operation parameters and construction personnel with different flexibility.


When paving larger width pavement, it is necessary to install the lengthened dividing rod part, and the side of the supporting rod should be equipped with an opening blade.


Please pay attention to the installation:


1) the shaft end of the base material dividing rod and the material dividing rod with long shaft end should be equipped with shaft sleeve to prevent the abrasion of the shaft section, and affect the assembly of the material dividing rod.


2) the spiral vanes on both sides of the support can be installed on the shaft sleeve and fastened with M20X120-8.8 bolts.


3) contact surface treatment in the assembly blade should be connected with clean, such as retention, the fastening will cause deformation of the blade, the result may lead to fracture of hardened blade.


4) in the paving operation, if there is material segregation, the opposite part of the blade can be installed on the upper part of the separation part.


5) when the feed rod section appears material can not distribute material, the material at least remove the 1~2 spiral blade, but remove the leaves after feeding shaft must be installed on the shaft sheath, prevent wear.