全部| 技术文章| 新品上市| 最新资讯| 行业聚焦| 案例故事| 图片|
;
工程机械之家>企业动态>A successful delivery of the loader
A successful delivery of the loader
来自:润邦重机,装船机 时间:2016-08-30 浏览数:0

A successful delivery of the loader  

In the near future, the 7100TPH loader made by Westshore, the largest coal mine in the Americas, has been successfully delivered.

The weight of the loader is 1500 tons and the arm is 67 meters long. All functional debugging, simulation loading test and whole machine weighing are completed before the whole machine is shipped.

This project has lasted for more than 1 years. It is the largest loader of run heavy machine, general assembly and debugging so far.

The smooth delivery of the product marks a new breakthrough in the construction of mineral bulk handling equipment in the mine.



上一篇: 下一篇:

我要评论:

加载全部评论