Willow workers on the first bridge of East Africa
Liu Gong's development in the country does not have to be made up at the expense of the tongue. Recently, Liu Gong helped the construction of the first bridge in East Africa.
Recently, the cable-stayed bridge kigamboni bridge across the board through the cross sea concern by guiding the construction of Tanzania Liugong OVM national No.1 Project - the first in East africa.
This is a modern bridge, located in the south of Sahara. It is the largest cable stayed cross sea bridge in Africa. It is praised as "the most spectacular first bridge in East Africa" by the people of Tanzania.
The bridge all the OVM third generation OVM250 unbonded steel strand cable system, the maximum size of 160 holes in the world, refresh world largest bridge hole cable record.
Ouweimu third generation OVM250 unbonded steel strand cable system structure is more reasonable, sealing, corrosion resistance is also higher and more reliable anchoring, anchoring technology OVM strand cable has been at the leading level in the world.
The Ki Gan Boni bridge was designed and constructed by international standards, which was built in September 2012. It connects Dar Es Salaam, the largest city in Tanzania. It is a single cable plane cable-stayed bridge with a cost of 135 million dollars, a total length of 680 meters, a main span of 200 meters, a bridge deck with a width of 32 meters, and a two-way 6 lane.
Through the bridge to further enhance the international influence of brand ouweimu.
Pay more attention to the information of the Liugong, welcome to the home of the construction machinery
(http://www.700618.com/search/0/0/default/0-0/Liugong)。
Wonderful recommendation:
Fusion of hydraulic and pneumatic technology
Zhonglian, win in innovation, ambition in progress
Zhongji Lingyu 2015 commendation Conference