The basic principle of paver spreading two       

Should regularly check the paving thickness to avoid large range error of 1, in the paving process.

2, when the use of paver automatic leveling system, must check whether the normal function of sensor.

3, should avoid artificial paving, except in some small area stalls area or paver can not operate shop.

Roller to 4, the next on the pavement of full width paving compaction area, paving material temperature, environmental factors, subgrade condition should be considered, in order to ensure that the paving layer in the cold thoroughly before compaction.

5, paving layer temperature must be reduced to less than 40 degrees, before the release of traffic, in order to avoid paving layer by rolling deformation.

6, in the paving process should be kept constant.

The end of 7, every day after work or transition, should try to transverse joints.

Try to avoid the screed adjustment should be 8, in the paving process.

9, the paver hopper to avoid consumption of dry (avoid paving segregation).

10, if there is no paved road edge stone wear layer paving screed suspension mode should be used. And prohibit the use of automatic leveling system.