全部| 技术文章| 新品上市| 最新资讯| 行业聚焦| 案例故事| 图片|
;
工程机械之家>技术>Inspection and inspection of RP952 aspha
Inspection and inspection of RP952 aspha
来自:工程机械之家 时间:2014-03-22 浏览数:0

Inspection and inspection of RP952 asphalt paver

1, before each class, the operator must check the control system and safety protection device work properly, and ensure that all protective devices have been installed.


2. Check the lubrication situation of all grease filling points before working everyday, and add grease according to the situation.


3, before each start, all switch or joystick, potentiometer knob placed in the middle, throttle switch or joystick placed in idle position.


4, such as safety protection device or other parts to check the failure, will affect the safe operation of the machine, should be immediately ruled out.


5, once abnormal noise and malfunction affect operation, must stop immediately.


6, paver every year should allow professional personnel to detect and written record of test results.



上一篇: 下一篇:

我要评论:

加载全部评论