Xugong XR360 completed the first pile test in the home subway
The day before, in the liberation of South Technology Square XCMG XR360 rotary drilling rig power, Xuzhou metro line three first pile construction. XR360 rotary drilling rig is equipped with intelligent control system with independent intellectual property rights. The power head has common mode and rock entry mode, which improves construction efficiency respectively for soil and rock formations. At present, the first pile test has been successful.
Xuzhou rail transit line 3 is a north-south trunk line. The line is about 18km, all of which are downline. It is planned to be opened for operation in December 2020. I believe that the Xugong rotary drilling rig will certainly show a new brilliance in the construction of the home subway.